📍 Yanbu, Madinah Province
Truck-Mounted Crane Inspection & Certification in Yanbu
Truck-mounted cranes place a telescopic boom crane on a standard truck chassis with a separate driving cab, and are one of the most common lifting machines for yard work, pipe delivery, maintenance and light construction across Saudi Arabia. Their capacity depends on the truck frame, subframe fixing and outrigger stability as well as the boom, and many operate with minimal maintenance in hot, dusty conditions. Independent inspection checks both the crane and the chassis it relies on. Yanbu Industrial City is a major petrochemical and refining centre on the Red Sea.
Truck-Mounted Crane inspection in Yanbu: local context
Refinery and petrochemical construction and maintenance work at Yanbu typically relies on mobile and crawler cranes setting vessels, columns and pipe-rack modules next to operating units, so crane documentation and condition are checked before the first lift. Coastal wind and soft ground under outriggers make load chart and LMI checks especially important. EES inspects and load tests cranes on site at Yanbu Industrial City, aligned with ASME B30.5, before lifts begin.
Truck-Mounted Crane inspection scope in Yanbu
- ✓Chassis frame and crane subframe mounting bolts, welds and any unauthorised modifications
- ✓Power take-off, hydraulic pump and drive-line, plus hydraulic tank level, filters and oil condition
- ✓Front and rear outriggers or stabilisers, extension beams, cylinders and the outrigger-extended interlock
- ✓Telescopic boom, wear pads and extension synchronisation, boom angle and length sensors
- ✓Load moment indicator or overload device and anti-two-block, including the calibration against test weights
- ✓Hoist rope, drum, hook block, safety latch and hoist brake holding
- ✓Slew bearing, slew gearbox and swing brake and lock
- ✓Truck brakes and air system, tyres, steering, lights and cab-side crane controls
Defects commonly found
- ✓Cracked or loose crane subframe mounts and chassis modifications without engineering approval
- ✓Outrigger cylinder leakage or missing outrigger interlock allowing crane use with outriggers retracted
- ✓Worn hydraulic pump or PTO giving low relief pressure, slow boom response and hot, contaminated oil
- ✓Boom wear pads worn out and hydraulic hose abrasion on the boom or turntable
- ✓Hoist rope worn at the end terminations or at sheaves, and non-functioning hook safety latch
Standards
- ✓ASME B30.5 Mobile and Locomotive Cranes
- ✓EN 13000 Cranes - Mobile cranes
- ✓OSHA 29 CFR 1926 Subpart CC (Cranes and Derricks in Construction)
- ✓Manufacturer specifications and load charts
Testing
A rated-capacity load test is typically carried out at 100%-125% of rated capacity at selected radii, depending on the standard and client, with the chassis, outriggers and overload device observed during the lift.
Frequency
Typically at least annually, with a check before mobilisation to a new site and more frequent inspection for units on heavy daily duty.
Who we support in Yanbu
Local focus areas: Yanbu Industrial City and Yanbu Commercial Port.
FAQs
Can you inspect a truck-mounted crane on site in Yanbu?+
Yes. Our inspectors travel to your yard or project site in Yanbu, including Yanbu Industrial City and Yanbu Commercial Port, so the equipment does not need to be moved.
Which industries in Yanbu request truck-mounted crane inspection?+
Typically operators and contractors in the Madinah Province from these sectors: Vision 2030 Mega-Projects; Oil, Gas & Petrochemical; Ports, Logistics & Warehousing; Power & Utilities.
What is the difference between a truck-mounted crane and a mobile crane?+
A truck-mounted crane uses a standard truck chassis and a PTO-driven hydraulic system, while many mobile cranes use a purpose-built carrier. They are generally inspected and tested under the same mobile crane requirements.
Why does a truck-mounted crane inspection include the truck chassis?+
The crane's rated capacity relies on the chassis frame, subframe fixing, brakes and tyres. Cracked or modified chassis members can invalidate the load chart, so they are part of the inspection.