📍 Al Khobar, Eastern Province
MEWP, Boom Lift and Manbasket Inspection in Al Khobar
Mobile elevating work platforms (MEWPs) and personnel baskets put people at height, so a leaking holding valve, a failed tilt or overload sensor or a cracked weld is a fall hazard, not just downtime. EES inspects and function-tests manlifts such as boom lifts and scissor lifts, suspended platforms and crane-suspended manbaskets, and documents each unit for site access. A dense hub of contractors, service companies and logistics operators serving the Eastern Province energy sector.
MEWP & Manlift Inspection in Al Khobar: local context
Al Khobar is better known as a base for contractors, service companies and logistics operators than as a plant town, so lifting equipment is often kept in yards and workshops, including around the Al Khobar Industrial Area, before it is mobilised to client sites across the Eastern Province. EES inspectors typically visit those yards, examine each item against manufacturer data and recognised standards, and issue reports and inspection tags ahead of the mobilisation date.
What we deliver in Al Khobar
- ✓Articulating and telescopic boom lifts: structure, boom pins and wear pads, slew ring, levelling system, upper and ground controls, and tilt and platform-load sensing where fitted
- ✓Scissor lifts: scissor arms and pins, maintenance support (safety prop), outriggers or levellers where fitted, pothole protection and emergency lowering
- ✓Hydraulic and electrical systems: cylinders, hoses and holding valves (leak and drift checks), batteries, chargers, engine, and emergency power or descent
- ✓Platform, guardrails, gates, harness anchorage points, capacity plate and the manufacturer's load and wind limits, with a function test at the rated platform load where the scheme requires
- ✓Suspended access platforms and swing stages: suspension rig, counterweights, anchor points, wire ropes, hoists, safety locks and secondary safety line, and platform capacity
- ✓Manbaskets suspended from cranes: basket construction and welds, lifting bridle, capacity marking, guardrails and toe boards, proof load test and review of the crane set-up and lift plan against requirements such as Saudi Aramco GI 7.027 (current revision)
- ✓Pre-use checklist, emergency lowering procedure and rescue plan review, so the crew can bring a stranded platform down safely
Standards
- ✓ANSI/SAIA A92 series (mobile elevating work platforms)
- ✓ASME B30.23 (Personnel Lifting Systems)
- ✓Saudi Aramco General Instructions (GI), including requirements such as GI 7.027 for personnel baskets (current revision)
- ✓EN 1808 (safety requirements for suspended access equipment) for swing stages
- ✓Manufacturer specifications and client site requirements
Documentation
- ✓Inspection report with function-test results and pass / fail status for each unit
- ✓Test certificate for manbaskets and platforms stating rated capacity and the test load applied
- ✓Inspection tag or sticker applied to the unit in the scheme your client uses
- ✓Defect list, re-inspection record and a register of units for the fleet or project
Who we support in Al Khobar
Local focus areas: Al Khobar Industrial Area, Dhahran Techno Valley.
Also available in Al Khobar
Rigging and Lifting Gear Inspection
Thorough examination and certification of wire rope, chain and web slings, shackles, hooks, hoists and lifting beams, with colour-coding and registers.
Learn more →Heavy Equipment Testing & Inspection
Third-party inspection and load testing for cranes, excavators, bulldozers and forklifts.
Learn more →Lifting Equipment Inspection & Load Testing
Third-party load testing of cranes, hoists, slings, shackles and lifting accessories.
Learn more →Crane Inspection & Certification
Mobile, tower, overhead and crawler crane inspection with certificates.
Learn more →Third-Party Certifications
Independent inspection reports, Certificates of Conformity and competency cards.
Learn more →Third-Party Inspection (TPI) for Aramco Projects
Independent inspection of cranes, lifting gear and heavy equipment before mobilisation to Aramco sites, prepared for Saudi Aramco GI and client requirements.
Learn more →Also serving: MEWP & Manlift Inspection in Dhahran, MEWP & Manlift Inspection in Dammam, MEWP & Manlift Inspection in Ras Tanura, MEWP & Manlift Inspection in Jubail
FAQs
Do you provide MEWP & Manlift Inspection in Al Khobar?+
Yes. EES provides MEWP & Manlift Inspection at client sites in Al Khobar, including Al Khobar Industrial Area and Dhahran Techno Valley. Contact us with your requirement and we will confirm scope and scheduling.
Which standards and documents apply to MEWP & Manlift Inspection in Al Khobar?+
Work in Al Khobar is aligned with the following standards and references: ANSI/SAIA A92 series (mobile elevating work platforms); ASME B30.23 (Personnel Lifting Systems); Saudi Aramco General Instructions (GI), including requirements such as GI 7.027 for personnel baskets (current revision); EN 1808 (safety requirements for suspended access equipment) for swing stages. On completion you receive: Inspection report with function-test results and pass / fail status for each unit; Test certificate for manbaskets and platforms stating rated capacity and the test load applied; Inspection tag or sticker applied to the unit in the scheme your client uses.
What does a MEWP inspection include?+
A structural and visual examination of the chassis, boom or scissor arms, pins and welds; function tests of every control including the ground controls and emergency lowering; checks of tilt, overload and limit devices; and a comparison of the platform marking with the manufacturer's capacity and operating limits. Depth and interval follow the manufacturer's manual and your client's scheme.
What is Saudi Aramco GI 7.027, and do I need a manbasket certificate to lift people with a crane?+
Saudi Aramco requirements such as GI 7.027 address personnel baskets suspended from cranes on Aramco work; we confirm the current revision and project conditions with you before we attend. OSHA 29 CFR 1926 and many client schemes allow crane personnel lifting only where a MEWP, scaffold or other conventional access is more hazardous or not possible, and expect the basket to be inspected and proof tested and the crane, rigging and lift plan reviewed first.